(Note: This is one of several methods of installing the Topargee water gauge in the Revel. See here and here and here for others.)
This what I did, no drilling needed. Just made the pipe, then slid it underneath the existing plumbing without removing the panel, then just made the two connections. Tightened connection at winterizing valve first, then at pump. This is the same hose you guys put the flow meter on, the hose from the winterizing valve to the inlet of the water pump (suction side). It took 30 to 45 minutes to do. I tied into power and ground at the switch for the running board light.
The special order fitting from Home Depot is this one.
(https://www.homedepot.com/p/Ecopoly-1-2-in-Plastic-PEX-Barb-x-1-2-in-BSP-Female-Swivel-Adapter-5-Pack-32873/308745733)
This what I did, no drilling needed. Just made the pipe, then slid it underneath the existing plumbing without removing the panel, then just made the two connections. Tightened connection at winterizing valve first, then at pump. This is the same hose you guys put the flow meter on, the hose from the winterizing valve to the inlet of the water pump (suction side). It took 30 to 45 minutes to do. I tied into power and ground at the switch for the running board light.
The special order fitting from Home Depot is this one.
(https://www.homedepot.com/p/Ecopoly-1-2-in-Plastic-PEX-Barb-x-1-2-in-BSP-Female-Swivel-Adapter-5-Pack-32873/308745733)